quotesaudiogalleryvideosharecommentsnotificationbookmarkarrow-upright-arrowleftrightup-arrowdown-arrowright-upleft-downleft-upright-downright-arrow-1menu
Bathroom Remodeling
Apex Build

Bathroom Remodeling

Turn your bathroom into a private spa. Our experts handle everything from custom tile work and modern vanities to comprehensive waterproofing and fixture installation.

Bathroom remodeling in Los Angeles

Planning a bathroom remodel in Los Angeles? Apex Build handles cosmetic refreshes, full gut renovations, and master bath builds across LA and the surrounding county, and we manage the LADBS permit process so you don't have to figure it out yourself. Get a free estimate and we'll walk the space with you before any demo starts.

Need More Information?

Drop Us a Message and We Will Get Right Back to You

Get in Toch

Licensed and local

Apex Build operates as a California general contractor under the CSLB General Building Contractor (Class B) classification, the license required for remodels that touch framing, plumbing relocation, or more than one trade. Our crews work across the San Fernando Valley and the Westside, and we pull every permit a project needs before work begins.

This page covers single-room bathroom work only. If you're renovating the whole house at once, see our home remodeling services. If the kitchen is the priority, see kitchen remodeling.

What's included

A bathroom remodel with Apex Build can cover any combination of the following, scoped to your project and budget:

  • Vanities and countertops (including quartz)

  • Tile and flooring, including large-format porcelain

  • Shower and tub systems, custom shower doors

  • Waterproofing and membrane work

  • Plumbing fixture relocation

  • Electrical and lighting upgrades

  • Ventilation

  • Grab bars, comfort-height toilets, and other accessibility fixtures

Our process

  1. Consult and estimate. We walk your bathroom, talk through what you want to change, and give you a scoped estimate.

  2. Design and permit review. We finalize fixture layout, finishes, and materials, then determine whether the project qualifies for a cosmetic e-permit or needs a full LADBS plan check.

  3. Permitting. We file and pull the permit before demo starts.

  4. Demolition and rough-in. Old fixtures come out, plumbing and electrical rough-in goes in if the layout is changing.

  5. Finish work. Tile, vanity, fixtures, and final electrical go in.

  6. Walkthrough. We inspect the finished space with you and close out any final permit sign-off.

What does a bathroom remodel cost in Los Angeles?

Los Angeles bathroom remodels generally fall into three pricing tiers, based on published Los Angeles contractor pricing:

Tier

Scope

Typical cost

Basic refresh

Paint, flooring, fixtures, no plumbing relocation

$10,000-$12,000

Full gut renovation

New tile, semi-custom vanity, quartz counters

$32,000-$41,000

Master bathroom remodel

Premium finishes, full layout freedom

$45,000-$58,000

These are typical ranges, not quotes. Your actual number depends on the size of the room, whether plumbing moves, and the finishes you pick. We give you a firm scoped estimate after the initial walkthrough.

Tub-to-shower and custom walk-in shower pricing

A straightforward prefab tub-to-shower conversion in Los Angeles typically runs $1,800 to $10,000, with most standard jobs landing between $2,500 and $8,000 depending on the stall and materials. A custom walk-in shower built as part of a larger remodel, rather than a prefab stall swap, is a different scope and usually runs $8,000 to $15,000.

Line items that factor into a shower conversion, per Angi's Los Angeles shower cost data: plumbing updates run $500 to $3,000, permits run $200 to $1,000, and disposal runs $300 to $800. Labor alone for a standard walk-in shower installation runs $454 to $2,272.

Do I need a permit to remodel a bathroom in LA?

It depends on what you're changing. The City of Los Angeles allows a combined e-permit that covers repair or replacement of cabinets, flooring, wall finishes, tile, counters, and plumbing or electrical fixtures, as long as those fixtures stay in their existing locations. No wall or opening changes are allowed under that e-permit, and no new plumbing or electrical penetration into an existing wall is allowed either.

If your remodel moves a wall, relocates a fixture into a new spot, or opens a wall for new plumbing or electrical, you need an in-person plan check at an LADBS Construction Services Center with two sets of floor plans before work starts. Most homes have a wet wall, the thicker interior wall carrying the main water lines. Keeping fixtures on or near it, per LADBS plumbing permit guidance, is usually what keeps a remodel inside the simpler e-permit rather than triggering a full plan check.

We determine which permit path your project needs during the design phase and handle the filing either way.

How long does a bathroom remodel take?

Construction on a standard bathroom, no major layout changes, typically takes 3 to 4 weeks. That's the build time only.

A full or primary bathroom remodel, counted from design through final walkthrough and including permit lead time, typically runs 6 to 10 weeks total. The gap between the two numbers is design, permitting, and material lead time, not slower construction.

If your bathroom remodel is your only bathroom, plan for it to be out of service for the length of the project. The heaviest demolition disruption, per remodel timeline data, lasts 1 to 3 days, after which dust and noise drop off, but the room itself stays unusable until the project wraps. We talk through a shower-access plan with you during the consult if this is your only bathroom.

What's involved in an ADA or aging-in-place bathroom remodel?

Full ADA compliance is a legal requirement for public buildings, not for a private home, so an accessible bathroom remodel in a house is a voluntary upgrade. Most homeowners who want one follow California's Title 24, Chapter 11B accessibility standards as a reference: a 60-inch turning radius, a minimum 36-inch doorway, a curbless (zero-threshold) shower, grab bars mounted 33 to 36 inches above the floor, a comfort-height toilet at 17 to 19 inches, and lever-style faucet handles.

Costs scale with how much of that you want. Basic accessibility upgrades, grab bars, an accessible toilet, lever faucets, run $8,000 to $12,000. A mid-range remodel with a roll-in shower, an accessible vanity, and proper clearances runs $15,000 to $25,000. A comprehensive remodel with a curbless shower and grab bars runs $15,000 to $45,000. Individual grab bars, installed, run $140 to $380 each in California.

Curbless, zero-threshold wet-room showers, a walk-in shower and freestanding tub in one fully tiled zone with a linear trench drain and no curb or glass half-wall, are one of the layouts Los Angeles homeowners are asking for most in master bath remodels right now, whether or not accessibility is the goal.

Why Apex Build

  • We pull the correct permit, e-permit or full plan check, based on your actual scope, so you're not guessing what LADBS requires.

  • We're licensed under CSLB's General Building Contractor classification for work that involves plumbing relocation or multiple trades.

  • Our crews know LA-specific details like wet wall placement that affect both cost and permit path.

  • One team handles design, permitting, and build, so you're not coordinating between separate designers and contractors.

Service area

Apex Build serves Los Angeles and LA County, including Sherman Oaks, Beverly Hills, Santa Monica, Woodland Hills, Studio City, Encino, Culver City, and Pasadena.

Bathroom Remodeling FAQ

Have questions? We've got answers. Here are some of the most common questions we receive from our customers.

A basic cosmetic refresh, paint, flooring, and fixtures with no plumbing relocation, runs $10,000 to $12,000. A full gut renovation with new tile, a semi-custom vanity, and quartz counters runs $32,000 to $41,000. A master bathroom remodel with premium finishes runs $45,000 to $58,000.

If you're keeping fixtures in their existing locations and not touching walls, a combined e-permit usually covers it. If you're moving a wall or relocating plumbing or electrical into a new spot, you need a full LADBS plan check with floor plans before work starts.

Construction on a standard bathroom with no layout changes takes about 3 to 4 weeks. A full or primary bathroom remodel, including design and permit lead time, typically runs 6 to 10 weeks start to finish.

Expect the bathroom to be unusable for the length of the project. The heaviest disruption from demolition lasts 1 to 3 days, after which dust and noise decrease, but the room stays out of service until the remodel is complete.

It's a voluntary upgrade for a private home, typically built around Title 24 Chapter 11B standards: wider doorways, a curbless shower, grab bars, a comfort-height toilet, and lever faucets. Costs run $8,000 for basic upgrades to $45,000 for a comprehensive remodel with a curbless shower.

A prefab tub-to-shower conversion runs $1,800 to $10,000, with most standard jobs falling between $2,500 and $8,000. A custom walk-in shower built as part of a larger remodel runs $8,000 to $15,000, a different scope than a simple stall swap.

Ready to Start Your Project?

Get a clear estimate and a realistic timeline before you commit to anything. We'll walk your property and tell you exactly what the work involves.

Free, Clear Quotes

Request a no-obligation estimate based on your home and needs.

Local LA Team

We're based in Los Angeles for fast response and scheduling.

Permits Handled for You

We pull permits and manage inspections, so the paperwork doesn't land on you.

Reliable Results

Consistent finishes that hold up over time

Projects Completed
Satisfied Homeowners
On-Time Projects
Years of Experience

Schedule Your Free On-Site Consultation Today!

Free Estimate